Barra do Palma Dam Profile
Location
Countries: Brasil
Basins: Araguaia - Tocantins
Rivers: Palma
Project Information
Capacity: 58 MW
Flooded Area: 82 Km2
Operational Status: Planned
Companies Involved: CELG Geração e Transmissão S/A / Construtora Andrade Gutierrez S/A / Centrais Elétricas do Norte do Brasil S/A (Eletronorte)
More Information
Companies:
- Eletronorte is a subsidiary of the federally state-owned holding Eletrobrás.
- CELG Geração e Transmissão S/A is a state-owned company controlled by the state of Goiás.
Studies:
The authorization for the viability studies of the hydroelectric plant Arraias was suspended by the Brazilian Electricity Regulatory Agency (Aneel) because a review of the Palmas's river inventory is being developed.
Links:
Source: